Debug table was not enabled for this build, to enable set enable_debug_table to true in _config.yml.

Part of the Archaeology and Classics building left up when building was demolished. Properly converted into a studio space in 2013, white to black walls, blue carpet to vinyl floor and rig installed. Drapes were installed later in 2015.

Studio B is used as the Main rehearsal space within the New Theatre building, as well as hosting occasional workshops and fringe shows.

2012 Nottingham 3 shows

New Theatre Studio B